电缆沟盖板安装的详细流程

来源:http://www.kpp647.com添加时间:2016-10-19 16:09:06

1、采用经纬仪和钢尺放样盖板板端控制线,控制线平行于电缆沟中心线,每20m设置一控制点。
1, using theodolite and steel plate end cover lofting control line, control line parallel to the cable channel center line, each 20m set a control point.
2、盖板搁置点位置为电缆沟沟道压顶中心线,盖板安装后中心线与电缆沟中心线一致。为确保盖板安装后无声响和避免局部承压,盖板搁置点设置一块3-5mm厚、50mm宽弹性橡胶垫片,采用胶接剂进行粘贴。

QQ截图20160902152044.png2, the cover aside location cable trench capping the center line, the cover after the installation of the center line and the center line of cable trench. In order to ensure that the cover plate is provided with no sound and the partial pressure is avoided, the cover plate is provided with a 3-5mm thick and 50mm wide elastic rubber pad.
3、依据板端控制线进行盖板安装,安装要确保盖板拼缝严密、平稳、顺直、无响声。安装过程中不得使用撬棍强行撬动盖板,以免损坏盖板、沟道压顶棱角或造成橡胶垫片的滑移。
3, on the basis of plate end control line cover installation, installation to ensure tight, smooth, seam cover straight, no sound. The installation process may use a crowbar forced to pry the cover, so as not to damage the slip cover, channel top edges or cause the rubber gasket.