铸铁护栏的正确安装步骤应该注意哪些细节?

来源:http://www.kpp647.com添加时间:2020-06-29 15:22:39

  铸铁护栏的正确安装步骤应该注意哪些细节?下面让山东铸铁护栏带大家一起来看一下吧!

  What details should be paid attention to in the correct installation steps of cast iron guardrail? Let's take a look at Shandong cast iron guardrail!

  一、下料必须准确无误,下好的材料要全部进行调直、调平。

  1、 The blanking must be accurate, and all the finished materials should be straightened and leveled。

  二、焊工工具、设备、检测设施要齐全到位,焊缝不得有裂纹、焊瘤、烧穿、孤坑等缺陷,表面不得有气孔。

  2、 The welder tools, equipment and testing facilities shall be complete and in place, and the weld shall be free of cracks, weld beading, burn through, solitary pit and other defects, and the surface shall be free of air holes。

  三、组装对接时必须在平台上操作,以确保装配时的几何尺寸。

  3、 The assembly and docking must be operated on the platform to ensure the geometric dimension during assembly.

                                    山东铸铁护栏

  四、铸铁护栏打磨时对每部位飞溅物要彻底清除,以保证表面美观、整洁。

  4、 When grinding cast iron guardrail, the spatter on each part should be completely removed to ensure that the surface is beautiful and tidy.

  五、铸铁护栏结构完成后,要进行高压喷砂处理,把工件上的尘、锈、油彻底清除,现出真正的铁灰本色后由专人喷漆或喷塑。

  5、 After the construction of cast iron guardrail is completed, high pressure sand blasting shall be carried out to completely remove dust, rust and oil on the workpiece. After the true iron gray color is shown, special personnel shall spray paint or spray plastic.

  六、成品完成后,要用塑料膜包装,以防划痕、落尘及附着飞溅物。

  6、 The finished product should be packed with plastic film to prevent scratch, dust and spatter.

  七、铸铁护栏制作过程中,从下料到喷塑完毕等各个环节全部检验,并做记录。制作完成后检验员根据图纸要求进行检验,并填写合格证,安装时人人配戴安全帽,扎好安全带,安全顺利地完成施工任务。

  7、 During the manufacturing process of cast iron guardrail, all links from blanking to spraying are inspected and recorded. After the completion of fabrication, the inspector shall carry out inspection according to the requirements of the drawings and fill in the certificate of conformity. During the installation, everyone shall wear safety helmet and fasten the safety belt to complete the construction task safely and smoothly.

  八、铸铁护栏制作时严格按照以下工序进行:审图-复核-排布尺寸-下料-调平-组装-校正-打磨-喷砂处理-喷漆或喷塑-检验-安装-验收。

  8、 The cast iron guardrail shall be manufactured in strict accordance with the following procedures: drawing review, review, layout, blanking, leveling, assembly, correction, grinding, sandblasting, painting or plastic spraying, inspection, installation and acceptance。

  以上是关于铸铁护栏正确安装步骤介绍,想要了解更多内容欢迎点击山东铸铁护栏http://www.kpp647.com官方网站。

  The above is about the correct installation steps of cast iron guardrail. If you want to know more, please click Shandong cast iron guardrail http://www.kpp647.com Official website.



  • 版权所有:济南顺健金属制品秒速赛车玩法 地址:山东省济南市天桥区金牛建材市场  
  • 电话:  手机号:18706412842 本网站由提供技术支持  流量统计:
二维码
济南万顺铸业秒速赛车玩法主要为大家提供山东球墨铸铁井盖铸铁护栏落水斗给水管排水管暖气片等产品的批量制作和安装服务,欢迎大家前来选购!
加拿大28 秒速赛车官网 秒速赛车平台 75秒赛车网站 百万彩票 加拿大28 秒速赛车登陆 秒速赛车 幸运时时彩