铁艺围墙安装时需要注意哪些细节?

来源:http://www.kpp647.com添加时间:2019-07-13 14:09:37

由于铸铁围栏不仅造型优美,还可以很好的适应各种地形,在山地,坡地等一些异常的地带也有着较为显着的使用性能。此外在运输方面的实用性的十分的出色,所以铸铁护栏受到人们的追捧!下面小编就给大家讲一讲在安装山东铸铁护栏是需要注意的几个要点!

As the cast iron fence is not only beautiful in shape, but also very good to adapt to various topography, in the mountains, slopes and other abnormal areas also have a more remarkable performance. In addition, the practicability of transportation is very excellent, so cast iron guardrail is sought after by people! The next edition will tell you about the installation of cast iron guardrail in Shandong Province is the need to pay attention to a few points!

一、铁艺围墙到达施工现场后按图纸上所规定的位置及尺寸准确安装就位,确定好标高及垂直平整度。应按照客户要求与图纸设计要求进行定位,确保达到设计要求与验收规范。

1. After the iron wall arrives at the construction site, it is accurately installed and positioned according to the position and size stipulated in the drawings to determine the elevation and the vertical flatness. It should be positioned in accordance with customer requirements and drawings design requirements to ensure that the design requirements and acceptance criteria are met.

二、铁艺围墙所提供的标准线抄水平定位安装,预埋间距根据楼梯踏步数量及图纸设计要求,安装定位。

2. The horizontal positioning installation of the standard line copy provided by the iron fence. The pre-embedded spacing shall be positioned according to the number of stair steps and the design requirements of the drawings.

三、预埋件、铁艺围墙安装必须牢固,安装偏差根据国家规定和设计要求:扶手直线度<3mm,垂直度<3mm,栏杆间距误差<3mm,对角线误差<3mm,预埋件垂直误差<3mm,水平误差<3mm。

3. Installation of embedded parts and iron wall must be firm. Installation deviation should be in accordance with national regulations and design requirements: handrail straightness < 3 mm, vertical < 3 mm, rail spacing error < 3 mm, diagonal error < 3 mm, embedded parts vertical error < 3 mm, horizontal error < 3 mm.

山东铸铁护栏

四、预埋件安装定位准确无误经验收后刷两道防锈漆,再进行铁艺围墙安装。

Fourthly, the installation and positioning of embedded parts are accurate and correct。 After receiving, brush two anti-rust paints, and then install the iron wall。

五、安装偏差必须符合国家规定和设计要求,达到验收标准。

5。 Installation deviation must conform to national regulations and design requirements and meet acceptance standards。

六、预埋件安装根据图纸设计要求和施工现场的实际情况准确无误的定位,避免造成不在一条平行线上。

6. Installation of embedded parts should be positioned accurately according to the design requirements of drawings and the actual situation of construction site, so as to avoid not being on a parallel line.

七、铁艺围墙安装完成后,接部位打磨光滑,刷两道防锈漆,经验收后再做表面一致处理。

7. After the installation of the iron wall, polish the joints smoothly and brush two anti-rust paints. After the experience is collected, the surface will be treated uniformly.

今天的精彩内容就暂且和大家介绍到这里了,如果大家还有其他想要了解的地方,欢迎大家到我们山东铸铁护栏的官网给我们留言评论:http://www.kpp647.com,或者直接拨打我们的咨询热线,我们将给您一个满意的答复!

Today's wonderful content will be introduced here for the time being. If you have other places you want to know, you are welcome to leave a message and comment on our Shandong Iron Fence website: http://www.kpp647.com, or call our hotline directly. We will give you a satisfactory answer!